Station 82 remodel addresses safety and accessibility issues
Fire Station 82 officially reopened on March 27 after receiving its first renovation in over 35 years. Fire stations are second homes for first responders, and Station 82 was in serious need of updates to keep its firefighters safe and ready to serve.
According to the station’s firefighters and city council members, the decision to renovate came after a 2018 report on the building identified several serious safety issues.
One of the biggest concerns was exposure to harmful gases and chemicals. Prior to the renovation, firefighters had no separate storage space for their gear, known as bunker gear. Bunker gear can introduce carcinogens to the space, and improper storage poses health risks to station residents.
“Now, we keep our bunker gear in a secluded room with no air ventilation, and we actually have a set gym away from the firetruck as well,” Captain Jon Wisemen said.
The fire station also updated its sprinkler system and replaced the old heating setup, which were both unsafe before the remodel.
“A lot of the firefighters don’t know this, but our heating used to come through the drainage system. So obviously we needed to address that in the renovation,” Assistant Chief of Operations Will Aho said.
Another focus of the renovation was making the building more inclusive. When the station was first built, most firefighters were men, so the layout did not meet women’s needs.
“Before the renovation, we used to have less bathrooms for women than men. Now, we’ve installed gender-neutral bathrooms to fit everyone’s needs,” Wiseman said.
The sleeping area also got a major upgrade. Before, firefighters had to sleep in one large room, which made it hard to rest properly. The station now has six private sleeping rooms, accommodating one firefighter each, for a quieter and more comfortable space.
Even smaller updates have made daily life better for firefighters.
“One of the things that I am most excited for is having a bathroom on the second floor. That was something that I feel like all of us needed for a while,” Aho said.
The station is one of 16 Eastside Fire & Rescue locations. Eastside Fire & Rescue covers 277 square miles on the Eastside, including but not limited to Sammamish, Woodinville, Mercer Island, and North Bend.
The renovation was approved and funded by the City of Sammamish with a budget of $8 million. The project began in 2021 with design and permitting. More than three years later, the project is complete.
Firefighters are thankful for the changes and the support they received from the community. With the renovations complete, Station 82 is now safer and equipped to support the people who protect Sammamish daily.
“We are just so grateful for the community’s support and excited to use this new space,” Fire Chief Ben Lane said.


